Why does the GP Manager crash during the insole measurement?

Error description

If you start a pressure measurement with MobilData by clicking on "Trade fairs" opens the measurement dialogue. The GP Manager then stops responding and must be closed.

Causes of errors

The GP Manager requires a connection to the measuring soles. These contain information that is required for the measurement. If the GP Manager only has a connection to the transmitters but not to the soles, it attempts to load this information and waits for a response.

Troubleshooting

Make sure that:

  • the soles are connected to the transmitters.
  • the soles are correctly engaged.
  • the soles are connected to the correct transmitter (L to L and R to R).

To rule out that the error is due to one of the soles, please test a second pair of soles. If the GP Manager then no longer crashes, one of the two soles is faulty.

If the problem persists, please contact GeBioM mbH Support.

Cookie Consent with Real Cookie Banner